How to Proceed with Noise Control! A Step-by-Step Guide to Soundproofing Projects

A Comprehensive Guide to Noise Control and Soundproofing: The Complete Process

The key to a successful soundproofing project lies in understanding the process. Here, we’ll break down the steps of noise control, from initial surveys to performance verification, in detail!

The Framework for Noise Control

The basic flow of a noise control project is as follows:

Survey and MeasurementAnalysis and PlanningProposalDesign and ManufacturingConstructionPerformance VerificationCompletion (if necessary, secondary or tertiary measures are implemented).

Survey, Measurement, and Analysis

The process begins with an on-site survey to identify the noise sources and their characteristics. Understanding these is essential to determine where and how much intervention is needed. Noise sources are often found in unexpected locations, making on-site surveys and measurements indispensable.

The collected data is analyzed by frequency to pinpoint the intensity and nature of the noise. If this stage is inaccurate, the entire project may be misaligned, leading to ineffective results. Accurate measurement and analysis form the foundation for all subsequent steps.

Planning and Proposal

Once the noise source is identified, the best countermeasure methods are planned. Simply covering the noise source is often insufficient, particularly in industrial settings where operational efficiency must be maintained. For example, easily removable covers or adjustments to surrounding equipment might be considered during the design phase.

At this stage, expected noise reduction levels are determined, and guaranteed performance values are established. Based on the findings, Enclosure Co., Ltd. provides a Noise Control Plan to the client.

 

Design, Manufacturing, and Construction

Next, the proposed countermeasures are translated into soundproof panel designs. Internal structures vary significantly depending on the noise type, and while specific details remain proprietary, the most suitable materials and configurations are selected.

Once the design is complete, the panels are manufactured in a factory and installed on-site. Occasionally, clients ask if construction can be subcontracted, but at Enclosure Co., Ltd., all installation is handled by experienced soundproofing professionals. This ensures the performance meets guaranteed values.

Performance Verification and Secondary Measures

After installation, performance verification is conducted to ensure the project meets the guaranteed values. For example, boundary noise levels must fall below set limits, noise levels 1m from soundproof covers must meet standards, and measurements adhere to labor safety regulations.

If guaranteed values are not achieved, secondary or tertiary measures are implemented at no additional cost to meet the required standards. Finally, the project concludes with the submission of a Performance Report confirming the achieved noise control values.

Leave Noise Control to the Experts!

From surveys to installation and verification, a comprehensive process is essential for effective noise control. At Enclosure Co., Ltd., experienced professionals handle every step, guaranteeing reliable soundproofing results. If you’re struggling with noise issues, don’t hesitate to reach out!